Construction Work Returning to U.S. 31 in Grand Haven

Road work

Photo: Getty Images

GRAND HAVEN (WOOD-AM) - Drivers on U.S. 31 in Grand Haven will see construction resume today.

The highway will be reduced to a single lane between 3rd and Jackson streets.

The northbound side will down to two lanes between Jackson and M-104. It will be down a single lane from M-104 to 3rd Street.

Ramp closures can also be expected.

Work is expected to run through May 1.

More at WOOD-TV.


Sponsored Content

Sponsored Content